Well, it's been a busy week and I haven't updated about the bathroom on a regular basis, so this might get a little long.
Some days you can see where a whole lot of work has been done, some days more of the work is detail-oriented or hidden, and not easily visible/noticeable. Coming home every day is an adventure - yesterday the attic stairs were pulled down in the garage. It's a regular thing to have every clock in the house blinking or maybe the dishwasher power is turned off at the breaker box. I'm also always sniffing to see what new smells have been introduced. The dust has settled over the house, even though he's not doing any more demolition there is a definite layer since I cleaned last week. Did I mention I need new vacuum cleaner bags?
So what does it look like? When last we left you, we had sinks though no hardware.
October 4 which was .... what.... Thursday? We came home and most of the upper shower had been tiled and the new shower liner added.

While we had the shower wall open, we found definitive evidence of termites. We tried 2x to have the exterminator come out and treat for carpenter ants (we've seen ants in the shower for the last few months) and to check out the termite damage and help us determine whether it is new or old. Each time the exterminator came out there has been no one here! We don't know where the contractor was - and I was out of town both Friday's.
Finally Jon came out on a Saturday and declared it possibly old damage - especially since we didn't see anything alive or crawling, and we know the house has been treated in the past (holes drilled in the patio and a treatment sticker under the kitchen sink). He sprayed all over the open walls and up into other opened parts.

This is what termite damage looks like with the mud knocked off and the damaged wood exposed. If you ever tear out a wall and see mud on the studs, you have a termite problem.
Allen cut this piece out and replaced it for us.
So far he's moved the light fixtures from one point to two separate lights over the two sinks. He's started work on making the one switch that controls the shower light and fan divided into one switch for each thing. In the front part, the sinks are in, the hardware is in there, and he started splitting the plumbing from one sink dividing it to handle two sinks.

He grounted the shower tile today and put in the shower fixtures. I could smell the grout the minute I walked in the door. Bryan had to buy some more bullnose tile so he can finish some trimming.
He's raising the ledge from the floor to the shower a little higher for more depth.
This photo shows on the left the wall where the termite damage was located - all closed up and tiled over.
And this is where it stands tonight. I don't know if Allen will be here tomorrow - he hasn't been here on the last two Fridays. So this is the end of week three. I'm very very very very very ready for this to be over. I don't know if it's four people sharing one bathroom, or the tools and buckets, mats and tarps, or the wet tile saw out back or the miter saw in the garage.
But I would love to be able to park my still-new Odyssey IN the garage again. I would like to vacuum and come home and it still be clean. I would like to get the front bedroom all fixed up again. This week has just seemed to drag on and on even though we clearly see progress.